Progress is continuing, although it may not be real obvious.
From the outside, things look about the same. But the roof was completed this week, and some HVAC changes were made as well. The fireplace is scheduled for this week, which then means the HVAC people can finish installing the gas lines. The siding has been delivered and hopefully they will start this week.
The electricians are close to finishing and hopefully they will finish tomorrow. The "smurf tube" (which is a flexible conduit for phone, tv antenna and computer wires, that, work with me here, is the same color as smurfs) should be installed this week.
And, after much ado, the cabinets were ordered last week and we have decided on what appliances we want.
So, what's next? We need to have the plumbing, electrical and HVAC all inspected, at which time we can call for a framing inspection, at which time we can do the termite spray (boracare, for those of you so interested) at which time we can insulate and then sheetrock. So, can we get all that done in a week? Probably not, but we are going to try.
Sunday, April 8, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment